Lapse¶
Override module for the lapse risk calculation
The formulas in this module overrides cells related to lapse in
projection
module.
Cells
|
Number of policies: Surrender override |
|
Surrender rate reflecting up/down lapse shocks |
Surrender rate multiple for the inner projection (Default: 1) |